id: aligned-frederick
name: Aligned Data Centers campus at Quantum Frederick
status: under-construction
location:
  country: US
  state: MD
  locality: Frederick
metrics:
  capacity_mw: 264
  capacity_mw_basis: unspecified
  land_acres: 74.89
  building_sqft: 3300000
  buildings: 4
first_seen: "2026-07-07"
last_updated: "2026-07-07"
confidence: medium
sources:
  - url: https://www.datacenterdynamics.com/en/news/aligned-looks-to-develop-three-more-data-centers-at-quantum-frederick-park-in-maryland/
    title: "Aligned looks to develop three more data centers at Quantum Frederick park in Maryland"
    publisher: DataCenter Dynamics
    date: "2026-07-06"
signals:
  - sig-20260706-aligned-quantum-frederick-capacity
  - sig-20260706-aligned-quantum-frederick-land
  - sig-20260706-aligned-quantum-frederick-sqft
  - sig-20260706-aligned-quantum-frederick-status
notes: >
  Aligned's own 74.89-acre campus sited within the larger Quantum Frederick /
  Quantum Loophole 2,100-acre park (tracked separately as
  quantum-loophole-frederick). Capacity: Building 1 (IAD04) is 72 MW; the
  planned four-building campus (3.3M sq ft) could reach 264 MW — the 264 MW
  figure is the full four-building buildout. Building 1 broke ground February
  2025 and is under construction; three further buildings proposed. Operator
  "Aligned Data Centers" has no operators.yml entry and needs one; operator