id: novva-west-jordan
name: Novva Data Centers West Jordan Campus
status: operational
location:
  country: US
  state: UT
  county: Salt Lake County
  locality: West Jordan
metrics:
  capacity_mw: 180
  capacity_mw_basis: unspecified
  land_acres: 100
  building_sqft: 1500000
first_seen: "2026-07-07"
last_updated: "2026-07-07"
confidence: high
sources:
  - url: https://grist.org/technology/utah-data-center-water-supply-meta-novva/
    publisher: Grist
    note: "wholesale campus spanning ~1.5M sq ft; developed/operating; closed-loop cooling filled once (~55,000 gallons)"
  - url: https://www.datacenterdynamics.com/en/news/novva-secures-2bn-loan-to-expand-west-jordan-campus-in-utah/
    title: "Novva secures $2bn loan to expand West Jordan campus in Utah"
    publisher: Data Center Dynamics
    note: "100-acre campus, ~1.5M sq ft across four phases, 180MW+ with 200MW substation, Phase 1 operational 2023 and further phases under construction"
signals:
  - sig-20260706-novva-west-jordan-sqft
  - sig-20260706-novva-west-jordan-status
  - sig-20260706-novva-westjordan-capacity
  - sig-20260706-novva-westjordan-investment
  - sig-20260706-novva-westjordan-land
  - sig-20260706-novva-westjordan-sqft
  - sig-20260706-novva-westjordan-status
notes: >-
  Operator "Novva Data Centers" has no entry in operators.yml and needs one
  before the operator field can be populated. Multi-phase campus: Phase 1
  operational since 2023 with additional phases under construction — recorded
  as operational with ongoing build-out. Both Grist and Data Center Dynamics
  independently give ~1.5M sq ft. capacity_mw 180 (reported "180MW+", with a
  200MW substation); no basis stated. investment_usd intentionally omitted:
  the reported $2B is a loan to fund build-out, not a stated total project
  cost.