id: powerhouse-louisville
name: PowerHouse Louisville
developer: powerhouse
status: under-construction
location:
  country: US
  state: KY
  county: Jefferson
  locality: Louisville
metrics:
  capacity_mw: 335
  capacity_mw_basis: unspecified
  land_acres: 154
  building_sqft: 1800000
  buildings: 6
confidence: medium
sources:
  - url: https://www.datacenterdynamics.com/en/news/powerhouse-plans-400mw-data-center-campus-in-louisville-kentucky/
    title: PowerHouse plans 400MW data center campus in Louisville, Kentucky
    publisher: DataCenterDynamics
    date: "2026-07-06"
signals:
  - sig-20260706-powerhouse-louisville-acres
  - sig-20260706-powerhouse-louisville-buildings
  - sig-20260706-powerhouse-louisville-capacity
  - sig-20260706-powerhouse-louisville-developer
  - sig-20260706-powerhouse-louisville-sqft
  - sig-20260706-powerhouse-louisville-status
first_seen: "2026-07-07"
last_updated: "2026-07-07"
notes: >-
  Single-source (DataCenterDynamics) cluster; billed as Kentucky's first
  hyperscale campus. Capacity reported as 335 MW secured, expandable to
  402 MW — recorded 335 as the load-bearing figure with the 402 expansion
  ceiling noted here. "Up to six buildings", ~1.8M sq ft across a 154-acre
  campus; first building and 130 MW targeted October 2026. Co-developed by
  PowerHouse Data Centers (AREP) and Poe Companies — Poe Companies needs an
  operators.yml entry before it can be recorded as a developer id.
  capacity_mw_basis unspecified: source does not state IT vs utility load.