id: vantage-mccarran
name: Vantage McCarran campus (NV11 / NV12)
operator: vantage
status: under-construction
location:
  country: US
  state: NV
  county: Storey
  locality: McCarran
metrics:
  buildings: 2
first_seen: "2026-07-07"
last_updated: "2026-07-07"
confidence: medium
sources:
  - url: https://www.datacenterdynamics.com/en/news/vantage-plots-two-data-centers-outside-reno-nevada/
    publisher: DataCenterDynamics
    note: "Two Vantage data centers (NV11, NV12) at 100 & 200 Electric Ave, McCarran."
signals:
  - sig-20260706-vantage-nv11-investment
  - sig-20260706-vantage-nv11-sqft
  - sig-20260706-vantage-nv11-status
  - sig-20260706-vantage-nv12-investment
  - sig-20260706-vantage-nv12-sqft
notes: >
  NV11 and NV12 are two buildings of one Vantage campus (same operator +
  locality McCarran, the reuse/identity key), so they are one record with
  per-building detail here rather than separate sites.
  NV11 (100 Electric Ave): ~489,125 sq ft, $150M, under construction with
  stated completion Q4 2026. NV12 (200 Electric Ave): ~259,540 sq ft, $254M,
  no explicit status signal. building_sqft and investment_usd left blank at
  the campus level to avoid inventing a total by summing differing
  per-building figures (KB-0002); buildings=2. Campus status "under-construction"
  reflects NV11; NV12 status unspecified. operational_date left blank — the
  Q4 2026 completion is a projection, not a firm date. Single source.