Sites / UT
Aligned Salt Lake City campus
Status: announced · Confidence: medium
Facts
| Location | Salt Lake City, UT |
|---|---|
| Capacity | 100 MW |
| First recorded | 2026-07-07 |
| Last updated | 2026-07-07 |
Signal notes
Operator "Aligned" has no entry in operators.yml and needs one before the operator field can be populated. Single source (Data Center Frontier); reported as Aligned's third Salt Lake City facility. capacity_mw of 100 is the added build-to-suit load; no basis (IT vs utility) stated.
Sources
- Aligned sees cloudy opportunity in Salt Lake City — Data Center Frontier
described as Aligned's third Salt Lake City data center, a build-to-suit adding 100MW
Signals
Raw observations behind this record (2):
sig-20260706-aligned-slc-capacity,
sig-20260706-aligned-slc-status
Record file · dataset licensed CC BY 4.0 — see provenance.