Sites / NV
Apple Reno/Sparks campus
Status: operational · Confidence: medium
Facts
| Location | NV |
|---|---|
| First recorded | 2026-07-07 |
| Last updated | 2026-07-07 |
Signal notes
Operator is Apple, which has no data/operators.yml entry — operator field omitted; needs an operators.yml entry before it can be attributed. Locality and county left blank: the source hint gives two equally-valid localities (Reno/Sparks) and two counties (Washoe/Storey) with no basis to choose one, so the id and location fall back to state (NV) per place precedence. building_sqft not populated as a total — the only figure is a "~400,000 sq ft third phase" increment, not a campus total (KB-0002: precision not invented). Status "operational" is inferred from the expansion language rather than an explicit status signal.
Sources
- https://www.forbes.com/sites/jeffsteele/2025/09/25/hyperscale-data-center-growth-comes-to-nevada/ — Forbes, 2025-09-25
Reports a ~400,000 sq ft third phase; single secondary source.
Signals
Raw observations behind this record (1):
sig-20260706-apple-reno-sqft
Record file · dataset licensed CC BY 4.0 — see provenance.