Sites / KS / Johnson
Beale Infrastructure De Soto hyperscale campus
Status: announced · Confidence: medium · Announced: 2026-04-29
Facts
| Location | De Soto, Johnson, KS |
|---|---|
| Building area | 1000000 sq ft |
| Buildings | 4 |
| Investment | $3000000000 |
| First recorded | 2026-07-07 |
| Last updated | 2026-07-07 |
Signal notes
Single-source record (Business Wire press release, 2026-04-29). Status "announced"; source says first phase breaks ground May 2026 — phase detail retained here until construction is separately confirmed. Developer "Beale Infrastructure" has no operators.yml entry — developer field omitted; Beale Infrastructure needs an operators.yml entry before it can be recorded as developer. investment_usd $3B is described as an estimate. building_sqft: source states "1 million+ sq ft"; recorded as a floor and it is unclear whether this is per-building or campus total — precision not resolvable from the single signal.
Sources
- Beale Infrastructure Announces Hyperscale Kansas Data Center Campus Advancing $3 Billion Infrastructure Investment — Business Wire, 2026-04-29
press release; billed as first hyperscale data center announced in Kansas; tenant not named
Signals
Raw observations behind this record (5):
sig-20260706-beale-desoto-buildings,
sig-20260706-beale-desoto-developer,
sig-20260706-beale-desoto-investment,
sig-20260706-beale-desoto-sqft,
sig-20260706-beale-desoto-status
Record file · dataset licensed CC BY 4.0 — see provenance.