bussetechsoftware studio

Sites / KS / Johnson

Beale Infrastructure De Soto hyperscale campus

Status: announced · Confidence: medium · Announced: 2026-04-29

Facts

LocationDe Soto, Johnson, KS
Building area1000000 sq ft
Buildings4
Investment$3000000000
First recorded2026-07-07
Last updated2026-07-07

Signal notes

Single-source record (Business Wire press release, 2026-04-29). Status "announced"; source says first phase breaks ground May 2026 — phase detail retained here until construction is separately confirmed. Developer "Beale Infrastructure" has no operators.yml entry — developer field omitted; Beale Infrastructure needs an operators.yml entry before it can be recorded as developer. investment_usd $3B is described as an estimate. building_sqft: source states "1 million+ sq ft"; recorded as a floor and it is unclear whether this is per-building or campus total — precision not resolvable from the single signal.

Sources

Signals

Raw observations behind this record (5): sig-20260706-beale-desoto-buildings, sig-20260706-beale-desoto-developer, sig-20260706-beale-desoto-investment, sig-20260706-beale-desoto-sqft, sig-20260706-beale-desoto-status

Record file · dataset licensed CC BY 4.0 — see provenance.