bussetechsoftware studio

Sites / NY

Blockfusion Niagara Falls data center

Status: operational · Confidence: low

Facts

LocationNiagara Falls, NY
Capacity300 MW
First recorded2026-07-09
Last updated2026-07-09

Signal notes

Blockfusion (a reformed crypto firm) signed an LOI for a $175M lease with an unnamed AI tenant. The 300MW is a prospective lease ceiling from the LOI, not confirmed built capacity. Status inferred operational from the existing-site lease framing; no explicit status signal. Operator "Blockfusion" needs an operators.yml entry, so operator is omitted.

Sources

Signals

Raw observations behind this record (1): sig-20260708-blockfusion-niagara-capacity

Record file · dataset licensed CC BY 4.0 — see provenance.