CloudHQ LC Campus (Ashburn)

Status: operational · Confidence: medium · Operational: 2019

Facts

OperatorCloudHQ (colo)
LocationAshburn, Loudoun, VA
Capacity160 MW (it-load)
Building area8500000 sq ft
Buildings14
Land97 acres
First recorded2026-07-05
Last updated2026-07-05

Signal notes

Multi-phase campus: LC1A/LC1B/LC2 operational; LC3/LC4 under construction as of April 2026 (14 buildings at full build-out). Headline capacity_mw is the 160MW currently leased IT load (LC1A 88MW + LC2 72MW, per ABS documentation — not utility MW); full build-out is planned at ~1.7GW. building_sqft is the 8.5M SF planned full-build figure (Baxtel, low confidence); DCD reports 403,410 sq ft of raised floor across LC1A + LC2 today — different measure, not a conflict. land_acres (97) and operational_date (2019) are low-confidence Baxtel figures.

Sources

  • CloudHQ seeks $1.4 billion in ABS funding — Data Center Dynamics, 2026-04-13
    14 buildings at full build-out; LC1A 88MW + LC2 72MW = 160MW leased IT load; full build-out 1.7GW; 403,410 sq ft raised floor (LC1A + LC2); LC1A/LC1B/LC2 operational, LC3/LC4 under construction as of April 2026.
  • CloudHQ Ashburn Campus Data Center — Baxtel
    97-acre campus (LC1A/LC1B on a 30-acre parcel); built 2019; 8.5M SF planned at full build (14 buildings). Low confidence.

Signals

Raw observations behind this record (8): sig-20260705-cloudhq-lc-buildings, sig-20260705-cloudhq-lc-capacity-mw, sig-20260705-cloudhq-lc-fullbuild-mw, sig-20260705-cloudhq-lc-land-acres, sig-20260705-cloudhq-lc-operational-date, sig-20260705-cloudhq-lc-sqft-planned, sig-20260705-cloudhq-lc-sqft-raisedfloor, sig-20260705-cloudhq-lc-status

Record file · dataset licensed CC BY 4.0 — see provenance.