Sites / TX / Ellis
DataBank Red Oak Campus
Status: under-construction · Confidence: medium
Facts
| Location | Red Oak, Ellis, TX |
|---|---|
| Capacity | 480 MW |
| Building area | 3400000 sq ft |
| Buildings | 8 |
| Land | 292 acres |
| First recorded | 2026-07-07 |
| Last updated | 2026-07-07 |
Signal notes
Operator DataBank needs an operators.yml entry (omitted here). Capacity per source: a 400MW Oncor substation delivering up to 240MW critical IT in Phase 1, scaling to 480MW total — resolved capacity_mw to 480 (full build), basis unspecified as the source mixes utility and critical-IT figures. Single primary (operator) source. Distinct from the Compass Red Oak campus (compass-red-oak) despite shared locality.
Sources
Signals
Raw observations behind this record (5):
sig-20260706-databank-red-oak-building-sqft,
sig-20260706-databank-red-oak-buildings,
sig-20260706-databank-red-oak-capacity,
sig-20260706-databank-red-oak-land,
sig-20260706-databank-red-oak-status
Record file · dataset licensed CC BY 4.0 — see provenance.