Status: under-construction · Confidence: medium · Operational: 2025-09

Facts

OperatorMeta (hyperscaler)
LocationNew Albany, Licking, OH
Capacity1000 MW
Land447 acres
First recorded2026-07-07
Last updated2026-07-07

Signal notes

Meta's "Prometheus" AI supercluster at the New Albany campus. capacity_mw 1000 from NBC4i's "~1 GW" (approximate; basis unspecified). A separate DCD signal reports a 200 MW on-site gas power plant approved to serve the site — that is generation capacity, not IT load, so it is NOT resolved into capacity_mw and is recorded here for context only. land_acres 447 from "more than 447 acres" (a floor, not exact). operational_date reflects "first cluster in service September 2025"; status is under construction / partially operational with expansion continuing through 2026.

Sources

Signals

Raw observations behind this record (6): sig-20260706-meta-prometheus-capacity, sig-20260706-meta-prometheus-gas-plant, sig-20260706-meta-prometheus-land-acres, sig-20260706-meta-prometheus-operational-date, sig-20260706-meta-prometheus-operator, sig-20260706-meta-prometheus-status

Record file · dataset licensed CC BY 4.0 — see provenance.