Sites / CT / New London
NE Edge Millstone hyperscale data centers
Status: cancelled · Confidence: medium
Facts
| Location | Waterford, New London, CT |
|---|---|
| Building area | 1500000 sq ft |
| First recorded | 2026-07-07 |
| Last updated | 2026-07-07 |
Signal notes
Single source (DataCenterDynamics), medium confidence. Two hyperscale data centers (~1.5M sq ft total) proposed behind-the-meter at Millstone Nuclear Power Station in Waterford, New London County, CT (site_hint gave "New London"; location signal is more specific — Waterford). Operator NE Edge has no operators.yml entry — operator field omitted; NE Edge needs an operators.yml entry, so the id slug uses the distinctive proper name. Status resolved to `cancelled` per the source, whose stated basis is the governor signaling a slowdown on new data centers in his 2026 State of the State — a thin/indirect basis; treat the cancellation as provisional pending a confirming source.
Sources
- NE Edge proposes 1.5 million sq ft data center at nuclear power station in Connecticut — DataCenterDynamics, 2026-07-06
~1.5M sq ft across two hyperscale data centers, behind-the-meter at Millstone Nuclear Power Station, Waterford.
Signals
Raw observations behind this record (3):
sig-20260706-ne-edge-millstone-location,
sig-20260706-ne-edge-millstone-sqft,
sig-20260706-ne-edge-millstone-status