bussetechsoftware studio

Sites / CT / New London

NE Edge Millstone hyperscale data centers

Status: cancelled · Confidence: medium

Facts

LocationWaterford, New London, CT
Building area1500000 sq ft
First recorded2026-07-07
Last updated2026-07-07

Signal notes

Single source (DataCenterDynamics), medium confidence. Two hyperscale data centers (~1.5M sq ft total) proposed behind-the-meter at Millstone Nuclear Power Station in Waterford, New London County, CT (site_hint gave "New London"; location signal is more specific — Waterford). Operator NE Edge has no operators.yml entry — operator field omitted; NE Edge needs an operators.yml entry, so the id slug uses the distinctive proper name. Status resolved to `cancelled` per the source, whose stated basis is the governor signaling a slowdown on new data centers in his 2026 State of the State — a thin/indirect basis; treat the cancellation as provisional pending a confirming source.

Sources

Signals

Raw observations behind this record (3): sig-20260706-ne-edge-millstone-location, sig-20260706-ne-edge-millstone-sqft, sig-20260706-ne-edge-millstone-status

Record file · dataset licensed CC BY 4.0 — see provenance.