Sites / TX / Taylor
Stargate Abilene (Lancium Clean Campus)
Status: under-construction · Confidence: medium
Facts
| Operator | OpenAI (ai) |
|---|---|
| Developer | Crusoe |
| Location | Abilene, Taylor, TX |
| Capacity | 1200 MW |
| First recorded | 2026-07-05 |
| Last updated | 2026-07-05 |
Signal notes
Under construction: first two of eight buildings operational Sept 2025; ~0.3 GW / 4 of 8 buildings operational as of April 2026 (Epoch); full 8-building / 1.2 GW build projected Q4 2026 (capacity_mw shown is the 1.2 GW committed campus, which conflicts by frame with the ~0.3 GW operational figure). Oracle leases and operates capacity for OpenAI — Oracle needs an operators.yml entry (operator field set to openai). A 600 MW Abilene expansion was scrapped in 2026 while the broader 4.5 GW Oracle-OpenAI agreement remains on track (Tom's Hardware, headline-level support only, article body truncated at fetch).
Sources
- OpenAI and Oracle to deploy 450,000 GB200 GPUs at Stargate data center in Abilene, Texas — Data Center Dynamics, 2025-10-15
- OpenAI Stargate: where the US sites stand — Epoch AI, 2026-04-17
- Oracle and OpenAI's Abilene expansion saga detailed: 600MW expansion gets scrapped, as larger 4.5GW agreement remains on track — Tom's Hardware, 2026
Signals
Raw observations behind this record (7):
sig-20260705-stargate-abilene-capacity-dcd,
sig-20260705-stargate-abilene-capacity-epoch,
sig-20260705-stargate-abilene-developer,
sig-20260705-stargate-abilene-expansion-scrapped,
sig-20260705-stargate-abilene-operational-date,
sig-20260705-stargate-abilene-operator,
sig-20260705-stargate-abilene-status
Record file · dataset licensed CC BY 4.0 — see provenance.