Sites / TX / Taylor
Stargate Abilene (Lancium Clean Campus)
Status: under-construction · Confidence: medium
Facts
| Operator | OpenAI (ai) |
|---|---|
| Developer | Crusoe |
| Location | Abilene, Taylor, TX |
| Capacity | 1200 MW |
| Buildings | 8 |
| First recorded | 2026-07-05 |
| Last updated | 2026-07-09 |
Location
Approximate — geocoded from the sourced location; see coverage. © OpenStreetMap contributors.
Signal notes
Under construction: first two of eight buildings operational Sept 2025; ~0.3 GW / 4 of 8 buildings operational as of April 2026 (Epoch); full 8-building / 1.2 GW build projected Q4 2026 (capacity_mw shown is the 1.2 GW committed campus, which conflicts by frame with the ~0.3 GW operational figure). The 1.2 GW campus power figure is now supported by Lancium (developer, 2025-03-18) alongside the earlier DCD/Epoch reporting. buildings=8 is the full-buildout count from Lancium (2025-03-18). Oracle leases and operates capacity for OpenAI — Oracle needs an operators.yml entry (operator field set to openai). building_sqft is left blank: sources conflict by frame and precision — Develop Abilene (2024-11-19) cites a single 998,000-sq-ft Crusoe building, while Lancium (2025-03-18) describes eight ~half-million-sq-ft buildings at full buildout (~4M sq ft total). Emitting either as a site-wide number would invent precision (KB-0002), so both are held in notes pending a clean sourced figure. A ~600 MW Abilene expansion was scrapped in 2026 (power not ready in time) while the broader 4.5 GW Oracle-OpenAI agreement remains on track — now corroborated by both Tom's Hardware and DataCenterDynamics (sig-20260706-abilene-expansion-cancelled). This is a dropped expansion phase, not the whole site; site status remains under-construction.
Sources
- OpenAI and Oracle to deploy 450,000 GB200 GPUs at Stargate data center in Abilene, Texas — Data Center Dynamics, 2025-10-15
- OpenAI Stargate: where the US sites stand — Epoch AI, 2026-04-17
- Oracle and OpenAI's Abilene expansion saga detailed: 600MW expansion gets scrapped, as larger 4.5GW agreement remains on track — Tom's Hardware, 2026
- Expanded development within Lancium's Clean Campus through Crusoe's 998,000-square-foot data center — Develop Abilene, 2024-11-19
- Crusoe expands AI data center campus in Abilene to 1.2 gigawatts — Lancium, 2025-03-18
- Oracle/OpenAI drop plans to expand flagship Abilene Stargate site; Meta in talks to pick up Crusoe capacity with Nvidia's help — DataCenterDynamics, 2026
Signals
Raw observations behind this record (11):
sig-20260705-stargate-abilene-capacity-dcd,
sig-20260705-stargate-abilene-capacity-epoch,
sig-20260705-stargate-abilene-developer,
sig-20260705-stargate-abilene-expansion-scrapped,
sig-20260705-stargate-abilene-operational-date,
sig-20260705-stargate-abilene-operator,
sig-20260705-stargate-abilene-status,
sig-20260706-abilene-building-sqft,
sig-20260706-abilene-buildings,
sig-20260706-abilene-capacity,
sig-20260706-abilene-expansion-cancelled
Record file · dataset licensed CC BY 4.0 — see provenance.