bussetechsoftware studio

Sites / NM / Doña Ana

Stargate Project Jupiter

Status: under-construction · Confidence: low

Facts

OperatorOpenAI (ai)
LocationDoña Ana, NM
Capacity2200 MW
First recorded2026-07-07
Last updated2026-07-07

Signal notes

Stargate Project Jupiter, sited in Doña Ana County, NM. site_hint gives only "Doña Ana, NM"; treated as the county (most-specific place resolvable), no locality asserted. Capacity 2.2 GW is a projection (2200 MW); basis (IT load vs utility) unstated. Named developer "STACK Infrastructure" has no operators.yml entry — developer field omitted; needs an operators.yml entry before it can be recorded. Single low-confidence source (Epoch AI).

Sources

Signals

Raw observations behind this record (3): sig-20260706-jupiter-capacity, sig-20260706-jupiter-developer, sig-20260706-jupiter-status

Record file · dataset licensed CC BY 4.0 — see provenance.