Sites / TX / Milam
Stargate Milam County Campus
Status: under-construction · Confidence: low
Facts
| Operator | OpenAI (ai) |
|---|---|
| Location | Milam, TX |
| Capacity | 1200 MW |
| First recorded | 2026-07-07 |
| Last updated | 2026-07-07 |
Signal notes
Operator resolved to openai via the "Stargate" alias in operators.yml. Developer reported as SB Energy/SoftBank, which needs an operators.yml entry (developer field omitted). 1.2 GW projected capacity (=1200MW). Under construction at steel-framing stage. Single low-confidence source.
Sources
Signals
Raw observations behind this record (3):
sig-20260706-milam-capacity,
sig-20260706-milam-developer,
sig-20260706-milam-status
Record file · dataset licensed CC BY 4.0 — see provenance.