Facts

OperatorOpenAI (ai)
DeveloperVantage Data Centers
LocationPort Washington, Ozaukee, WI
Capacity1300 MW
First recorded2026-07-07
Last updated2026-07-07

Signal notes

Single-source record (Epoch AI, a secondary analyst), all consumed signals low-confidence, hence aggregate confidence low. Operator resolved to openai via the "Stargate" program alias; developer resolved to vantage ("Vantage"). Capacity stated as "1.3 GW projected" (1300 MW); the source does not say whether this is IT load or utility, so capacity_mw_basis is unspecified. Status "under construction (foundation work)" maps to under-construction.

Sources

Signals

Raw observations behind this record (3): sig-20260706-portwashington-capacity, sig-20260706-portwashington-developer, sig-20260706-portwashington-status

Record file · dataset licensed CC BY 4.0 — see provenance.