Sites / MI / Washtenaw
Stargate Michigan campus
Status: announced · Confidence: medium · Announced: 2025-12-19
Facts
| Operator | OpenAI (ai) |
|---|---|
| Location | Washtenaw, MI |
| Capacity | 1400 MW |
| Land | 575 acres |
| First recorded | 2026-07-07 |
| Last updated | 2026-07-07 |
Signal notes
Stargate program site (OpenAI / Oracle / SoftBank); operator recorded as openai (Stargate alias). Site developer is Related Digital, which has no operators.yml entry — developer field omitted, needs an entry. Oracle and SoftBank are also involved and lack operators.yml ids. capacity_mw = 1400 reflects a stated 1.4 GW power-supply agreement with DTE Energy (19-year contract), not a disclosed IT load — basis unspecified. Investment reported as an estimated $7-10 billion (Latitude Media); left blank as a single numeric value cannot represent a range without inventing precision. Status set to announced: Michigan PSC conditionally approved the power contract 2025-12-19 and 575 acres are pending rezoning with permitting ongoing (not yet fully permitted). announced_date reflects the PSC approval. Single-source (Latitude Media) → medium confidence.
Sources
- What the Michigan Stargate site says about today's AI market — Latitude Media, 2026-07-06
Signals
Raw observations behind this record (5):
sig-20260706-mi-stargate-capacity,
sig-20260706-mi-stargate-developer,
sig-20260706-mi-stargate-investment,
sig-20260706-mi-stargate-land,
sig-20260706-mi-stargate-status
Record file · dataset licensed CC BY 4.0 — see provenance.