Sites / CO / Arapahoe
QTS Aurora-Denver campus
Status: under-construction · Confidence: medium
Facts
| Operator | QTS Data Centers (colo) |
|---|---|
| Location | 1160 N. Gun Club Road, Aurora, Arapahoe, CO |
| Capacity | 177 MW |
| Buildings | 4 |
| Investment | $1000000000 |
| First recorded | 2026-07-07 |
| Last updated | 2026-07-07 |
Signal notes
All attributes trace to a single source (The Colorado Sun, 2025-08-18), so aggregate confidence is medium despite internal consistency; no independent corroboration. land_acres omitted as a plain metric: the source gives a range ("~65-67 acres") rather than a single figure, and picking or averaging a value would invent precision the source does not carry (KB-0002). Recorded here instead: land is reported as approximately 65-67 acres. investment_usd sourced as "$1 billion+"; recorded as 1000000000 as a stated floor — actual figure may be higher. capacity_mw sourced as 177 MW, described as "projected to become Colorado's largest single electric load"; the source does not specify IT-load vs utility-load basis, so capacity_mw_basis is unspecified (the "electric load" framing hints at utility/grid load but is not definitive).
Sources
- Colorado Xcel data center demand spending — The Colorado Sun, 2025-08-18
Single source for all attributes on this site.
Signals
Raw observations behind this record (6):
sig-20260706-qts-aurora-acres,
sig-20260706-qts-aurora-buildings,
sig-20260706-qts-aurora-investment,
sig-20260706-qts-aurora-mw,
sig-20260706-qts-aurora-operator,
sig-20260706-qts-aurora-status
Record file · dataset licensed CC BY 4.0 — see provenance.