Sites / MD
Quantum Frederick campus (Quantum Loophole / Catellus)
Status: announced · Confidence: medium
Facts
| Location | Frederick, MD |
|---|---|
| Capacity | 1000 MW |
| Land | 2100 acres |
| Investment | $100000000 |
| First recorded | 2026-07-07 |
| Last updated | 2026-07-07 |
Signal notes
Master-planned 2,100-acre gigawatt-scale campus at the former Alcoa Eastalco Works; distinct from the smaller 74.89-acre Aligned campus within it (aligned-frederick). Site acquired June 2021; TPG affiliate Catellus now sole developer. capacity_mw = ~1 GW cited as transmission available (not confirmed IT load), hence basis unspecified. investment_usd = ~$100M is the land acquisition cost, not total project spend. building_sqft omitted: the "up to 600,000 sq ft" figure is a per-building build-to-suit maximum, not a campus total. Developer Catellus / Quantum Loophole (TPG) has no operators.yml entry and needs one; developer field omitted rather than invent an id. Single-source (Data Center Frontier).
Sources
- Quantum Loophole plans 2,100-acre data center campus in Maryland — Data Center Frontier, 2026-07-06
Signals
Raw observations behind this record (6):
sig-20260706-quantum-frederick-capacity,
sig-20260706-quantum-frederick-developer,
sig-20260706-quantum-frederick-investment,
sig-20260706-quantum-frederick-land,
sig-20260706-quantum-frederick-sqft,
sig-20260706-quantum-frederick-status
Record file · dataset licensed CC BY 4.0 — see provenance.