bussetechsoftware studio

Sites / MD

Quantum Frederick campus (Quantum Loophole / Catellus)

Status: announced · Confidence: medium

Facts

LocationFrederick, MD
Capacity1000 MW
Land2100 acres
Investment$100000000
First recorded2026-07-07
Last updated2026-07-07

Signal notes

Master-planned 2,100-acre gigawatt-scale campus at the former Alcoa Eastalco Works; distinct from the smaller 74.89-acre Aligned campus within it (aligned-frederick). Site acquired June 2021; TPG affiliate Catellus now sole developer. capacity_mw = ~1 GW cited as transmission available (not confirmed IT load), hence basis unspecified. investment_usd = ~$100M is the land acquisition cost, not total project spend. building_sqft omitted: the "up to 600,000 sq ft" figure is a per-building build-to-suit maximum, not a campus total. Developer Catellus / Quantum Loophole (TPG) has no operators.yml entry and needs one; developer field omitted rather than invent an id. Single-source (Data Center Frontier).

Sources

Signals

Raw observations behind this record (6): sig-20260706-quantum-frederick-capacity, sig-20260706-quantum-frederick-developer, sig-20260706-quantum-frederick-investment, sig-20260706-quantum-frederick-land, sig-20260706-quantum-frederick-sqft, sig-20260706-quantum-frederick-status

Record file · dataset licensed CC BY 4.0 — see provenance.