Switch Pyramid Campus (Grand Rapids)
Status: operational · Confidence: medium
Facts
| Location | Grand Rapids, Kent, MI |
|---|---|
| Capacity | 320 MW |
| Building area | 1800000 sq ft |
| Investment | $5000000000 |
| First recorded | 2026-07-07 |
| Last updated | 2026-07-07 |
Signal notes
Operator is Switch, which has no operators.yml entry — operator field omitted; Switch needs an operators.yml entry. Site id derived from the distinctive proper name (Switch Pyramid) plus locality since no operator id is known. building_sqft = 1,800,000 is planned white space across the campus; first phase (converted Steelcase Pyramid) is 225,000+ sq ft. investment reported as ~$5 billion (approximate). capacity 320 MW, basis unspecified. Operational and expanding (GRR NAP 02 expansion underway). Single-source (DataCenter Dynamics) → medium.
Sources
- Switch begins work on expanding Pyramid campus in Grand Rapids, Michigan — DataCenter Dynamics, 2026-07-06
Signals
Raw observations behind this record (4):
sig-20260706-switch-grand-rapids-capacity,
sig-20260706-switch-grand-rapids-investment,
sig-20260706-switch-grand-rapids-sqft,
sig-20260706-switch-grand-rapids-status
Record file · dataset licensed CC BY 4.0 — see provenance.