Aligned Data Centers campus at Quantum Frederick

Status: under-construction · Confidence: medium

Facts

LocationFrederick, MD
Capacity264 MW
Building area3300000 sq ft
Buildings4
Land74.89 acres
First recorded2026-07-07
Last updated2026-07-07

Signal notes

Aligned's own 74.89-acre campus sited within the larger Quantum Frederick / Quantum Loophole 2,100-acre park (tracked separately as quantum-loophole-frederick). Capacity: Building 1 (IAD04) is 72 MW; the planned four-building campus (3.3M sq ft) could reach 264 MW — the 264 MW figure is the full four-building buildout. Building 1 broke ground February 2025 and is under construction; three further buildings proposed. Operator "Aligned Data Centers" has no operators.yml entry and needs one; operator field omitted rather than invent an id. Single-source (DataCenter Dynamics).

Sources

Signals

Raw observations behind this record (4): sig-20260706-aligned-quantum-frederick-capacity, sig-20260706-aligned-quantum-frederick-land, sig-20260706-aligned-quantum-frederick-sqft, sig-20260706-aligned-quantum-frederick-status

Record file · dataset licensed CC BY 4.0 — see provenance.