Novva Data Centers West Jordan Campus

Status: operational · Confidence: high

Facts

LocationWest Jordan, Salt Lake County, UT
Capacity180 MW
Building area1500000 sq ft
Land100 acres
First recorded2026-07-07
Last updated2026-07-07

Signal notes

Operator "Novva Data Centers" has no entry in operators.yml and needs one before the operator field can be populated. Multi-phase campus: Phase 1 operational since 2023 with additional phases under construction — recorded as operational with ongoing build-out. Both Grist and Data Center Dynamics independently give ~1.5M sq ft. capacity_mw 180 (reported "180MW+", with a 200MW substation); no basis stated. investment_usd intentionally omitted: the reported $2B is a loan to fund build-out, not a stated total project cost.

Sources

Signals

Raw observations behind this record (7): sig-20260706-novva-west-jordan-sqft, sig-20260706-novva-west-jordan-status, sig-20260706-novva-westjordan-capacity, sig-20260706-novva-westjordan-investment, sig-20260706-novva-westjordan-land, sig-20260706-novva-westjordan-sqft, sig-20260706-novva-westjordan-status

Record file · dataset licensed CC BY 4.0 — see provenance.