Facts
| Location | West Jordan, Salt Lake County, UT |
|---|---|
| Capacity | 180 MW |
| Building area | 1500000 sq ft |
| Land | 100 acres |
| First recorded | 2026-07-07 |
| Last updated | 2026-07-07 |
Signal notes
Operator "Novva Data Centers" has no entry in operators.yml and needs one before the operator field can be populated. Multi-phase campus: Phase 1 operational since 2023 with additional phases under construction — recorded as operational with ongoing build-out. Both Grist and Data Center Dynamics independently give ~1.5M sq ft. capacity_mw 180 (reported "180MW+", with a 200MW substation); no basis stated. investment_usd intentionally omitted: the reported $2B is a loan to fund build-out, not a stated total project cost.
Sources
- https://grist.org/technology/utah-data-center-water-supply-meta-novva/ — Grist
wholesale campus spanning ~1.5M sq ft; developed/operating; closed-loop cooling filled once (~55,000 gallons) - Novva secures $2bn loan to expand West Jordan campus in Utah — Data Center Dynamics
100-acre campus, ~1.5M sq ft across four phases, 180MW+ with 200MW substation, Phase 1 operational 2023 and further phases under construction
Signals
Raw observations behind this record (7):
sig-20260706-novva-west-jordan-sqft,
sig-20260706-novva-west-jordan-status,
sig-20260706-novva-westjordan-capacity,
sig-20260706-novva-westjordan-investment,
sig-20260706-novva-westjordan-land,
sig-20260706-novva-westjordan-sqft,
sig-20260706-novva-westjordan-status