Sites / NV / Storey
Vantage McCarran campus (NV11 / NV12)
Status: under-construction · Confidence: medium
Facts
| Operator | Vantage Data Centers (colo) |
|---|---|
| Location | McCarran, Storey, NV |
| Buildings | 2 |
| First recorded | 2026-07-07 |
| Last updated | 2026-07-07 |
Signal notes
NV11 and NV12 are two buildings of one Vantage campus (same operator + locality McCarran, the reuse/identity key), so they are one record with per-building detail here rather than separate sites. NV11 (100 Electric Ave): ~489,125 sq ft, $150M, under construction with stated completion Q4 2026. NV12 (200 Electric Ave): ~259,540 sq ft, $254M, no explicit status signal. building_sqft and investment_usd left blank at the campus level to avoid inventing a total by summing differing per-building figures (KB-0002); buildings=2. Campus status "under-construction" reflects NV11; NV12 status unspecified. operational_date left blank — the Q4 2026 completion is a projection, not a firm date. Single source.
Sources
- https://www.datacenterdynamics.com/en/news/vantage-plots-two-data-centers-outside-reno-nevada/ — DataCenterDynamics
Two Vantage data centers (NV11, NV12) at 100 & 200 Electric Ave, McCarran.
Signals
Raw observations behind this record (5):
sig-20260706-vantage-nv11-investment,
sig-20260706-vantage-nv11-sqft,
sig-20260706-vantage-nv11-status,
sig-20260706-vantage-nv12-investment,
sig-20260706-vantage-nv12-sqft